View of the 888 and VSC from the entrance under T4 (trucks that pass through the VSC on their way to any other location in WTC will come towards us in this picture). And head north, this way:
Get ready to say goodbye to the 888 work horse btw. The old girl is leaving next weekend (if plans go ahead).
So what's the big circle that's getting a hefty concrete pad?
That's a concrete footing for the spiral or helix ramp that will bring vehicles down from street level. a circular wall will reach from that footing up to street level with a multitude of steel columns, beams and slabs tied in to it (on a slope). It is also tied deeply into the rock with tie downs. It's essentially the anchor of the entire building.
Last edited by IrishInNYC; March 28th, 2012 at 10:56 AM.
Too bad that the exterior & form of the building doesn't reflect that circular shape.
The new St. Nicholas Greek Orthodox Church will bet set (basically) atop that location, yes?
Exactly, in fact now that I look at it, the church may actually be placed more so on the north half of the circle, exerting an eccentric load down onto that slab, which may explain the tie downs we have to drill on the south; to resist the "tipping" effect of the church above.
Thank you for all of this, btw. Fantastic info.
So the 888 will stay a bit longer?
Another question, will they also excavate the southern part of Phase II (the part south of the new wall which is poured these days)? Or do they wait until it is decided what will be build there?
Many thanks for your regular updates and pics, IrishInNYC!!
When the 888 does leave will the 16000 lift it out?
"He ain't heavy, he's my brother"
Is the PA responsible for building out Cedar St. or will that fall to the eventual developer of T5? It'd be nice if the road went in, at least, and then just the T5 site was closed off.
How deep was the foundation for the old Deutsche Bank building? Is what we see south of the T5 wall original land? Or is that fill remaining after the demo of DB?