Jeez. How telling is it that you posted a picture of "The Future".
Man, looking at that ruined by night.
Yes
No
Jeez. How telling is it that you posted a picture of "The Future".
Man, looking at that ruined by night.
This is not meant to be directed at Sherpa alone. The comment is for all.
Please no conspiracy theories of Ratner cutting off the skin going forward at this point now and moving to brick ...
The much-ado about cutting off height was based on conjecture and proved to be completely baseless so let's not repeat the paranoia.
It does seem premature, considering the brackets for the current skin continue some 20 stories above where they are at skinning the building right now. Based on watching them construct the cladding up until now, I think they are building a temporary set of rigs to hang the stuff over the mechanical floors. Because they are walled off, the workers cannot just stand on the inside and put the pieces up. Here's some photographic evidence for all of this:
Brackets:
Temporary Rigs:
Since this post can't stay visible forever, though, be ready to repeat this ad infinitum for weeks.
That isn't what I meant at all. I meant he ordered x quantity of the cladding, ran out, and then needed to order more. If the height cut was a baseless rumor, then I guess I'm wrong. It was stuck at the same height for some time, though, regardless of whether or not Ratner was seriously considering it or using it as a bargaining tool.
These are amazing photos of an utterly amazing building!
I have a theory on the cladding. as it was going, new cladding was arriving every day and just barely ahead of the installation.
I'm guessing they want to do the next three floors pretty much at once. They're ( have? ) putting in a special dolly thing to lift the panels into place and install them. so I think it's 3 floors up at a time around the building.
that being the case, they need to have the next three floors on hand before they can start, hence the wait. when they finally do start installing again,it will be pretty obvious if my guess is right or wrong.
Scroll down to the post from "Onn" at pg 62:
http://www.skyscrapercity.com/showth...404222&page=62
The following information was last updated on October 21, 2009.
Superstructure erection is underway, now at 73 stories.
Curtain wall installation continues and should be completed by winter 2009/2010. The brick facade on the lower stories is complete.
The contract RFP for finishing work on the building's school was issued in late May 2009.
Building will top out in December 2009
Full sidewalk closures on Spruce and Beekman Streets beside the work site
Extended work hours Monday through Saturdays 6:30 a.m. to 8 p.m.
I hope this building does phenomenally well and shows that good architecture pays off. Then maybe Ratner could start planning his next Gehry tower. Maybe in Midtown West this time.