Thread: Assemblages, Building Prospects, Back Burner and Visions

  1. #61
    Crabby airline hostess - stache's Avatar
    Join Date
    Jun 2004
    Location
    Nairobi Hilton
    Posts
    8,511

    Default Thank you jeff : )

    Our first clue!

  2. #62

    Default New Tower at 57th and 2nd?

    From the June 20, 2006 edition of therealdeal.net:

    For first time ever, developer to build public schools in exchange for air rights
    Developer World Wide Holdings is slated to build two new public schools in Midtown as part of an agreement formalized June 13. In exchange, the developer will acquire the air rights above the East 57th Street Educational Campus at Second Avenue, home to the High School of Art & Design and the Beekman Hill International School.

    This is the first time in the city's history a private developer will lease school air rights on municipally owned land in return for erecting new school buildings.

    "The purpose is to build top-notch school buildings at no cost to us," said Margie Feinberg, spokewoman for the Department of Education. "We're always looking for available space for our schools because we are so overcrowded."

    Under the terms of the 75-year-lease, Feinberg said, World Wide acquires the air rights & 8213; unused development space above a building that can be used to add to the existing building or transferred to another structure & 8213; for the development of a 461,000-square-foot residential and/or retail building.

    In return, she said, World Wide will spend $130 million to build a new 85,500-square-foot elementary school and an 182,000-square-foot high school to replace the existing school buildings. A spokesman for World Wide declined to comment. By Lauren Elkies

  3. #63
    Disgruntled Optimist lofter1's Avatar
    Join Date
    Jun 2005
    Location
    NYC - Downtown
    Posts
    32,654

    Default

    Developer buys 17 buildings, sparks eviction fears

    The Villager
    Volume 76, Number 15
    By Gerard Flynn
    August 30 -September 5, 2006

    Extell Development Corporation’s acquisition of rent-stabilized properties in the East Village is giving occupants the jitters and stirring some to organize in anticipation of potential problems with the real estate investor, a number of tenant-advocacy groups said last week.

    Speaking from the offices of the Good Old Lower East Side, or GOLES, Wasim Lone, a housing-rights advisor, said he has been fielding questions from worried residents of the properties since news broke of the purchase earlier this year.

    “Once tenants heard who the owner is, they started to get anxious,” he said. “We can’t really fathom yet what their real plans are, but tenants are concerned about demolition being used as a way to evict them, which is happening right now in another building owned by Extell at E. 17th St.,” he said.

    The East Village parcels were purchased from Merlon Management in January. Seventeen buildings — all five- and six-story walkups — they formed part of a $72 million portfolio deal, according to real estate broker Robert Perl, who played an advisory role in the transaction. Perl said the bulk of the properties are actually in Harlem.

    Perl said that although some individual buildings are scattered throughout the East Village, the bulk are clustered on Second Ave. through Avenue B, between 11th and 13th Sts.

    Since 2005, Extell has been buying properties all over the city, including major investments in the luxury condo market. Last year, Extell teamed with The Carlyle Group in a blockbuster purchase of Donald Trump’s Riverside South megadevelopment project on the Upper West Side. The Carlyle-Extell connection has some East Villagers worried. A powerful multinational investment firm linked to right-wing governments, The Carlyle Group figured prominently in Michael Moore’s film “Fahrenheit 911” for its close ties to the Bush family and the Saudi royal family.

    “It’s crazy that The Carlyle Group may be purchasing a piece of the East Village,” said Steven Herrick, executive director of the Cooper Square Committee.

    Fearing plans for condo conversions, 10 tenants from the East Village purchase have sought assistance from C.S.C., Herrick said.

    Herrick said that although C.S.C. is still probing for signs of Extell’s intentions, they have helped tenants form a committee — just in case. They expect to engage executives from the company at an upcoming Community Board 3 meeting in September to learn more of the developer’s plans.

    They may file a demolition plan for some of these buildings, that’s one of the things we are speculating on, but we really don’t know,” he said.

    Under a provision in the Rent Stablization Law, building owners can evict residents in a rent-stabilized building if they can prove to the New York State Division of Housing and Community Renewal that the building needs to be demolished.

    “A rent-stabilized tenant has an automatic right to renew the lease and you are protected, but it doesn’t preclude the landlord from pursuing his legal avenues to deal with that,” Lone said.

    According to Assemblymember Deborah Glick, many landlords have discovered this avenue and it is bringing them all the way to the open doors of D.H.C.R. She and other critics have a name for it: “phony demolition.”

    In a letter two years ago to D.H.C.R. Commissioner Judith Calogero, Glick warned of the dangers to rent-regulation legislation from a “disturbing trend whereby owners manipulate the letter and spirit of the law to push out rent-stabilized tenants, solely to increase their profits.”

    Glick urged Calogero to take action against this trend and to ensure that D.H.C.R. “not allow owners to take advantage of the Rent-Stabilization Law and define ‘demolition’ to meet their own interests.”

    Speaking last week, Glick said that although a rent-stabilized tenant can challenge the eviction order in court, many, especially the elderly, can’t afford to retain a lawyer and instead comply with the eviction order.

    With the apartment vacant, the owner decides against demolition; instead remodeling it into a luxury unit, which may involve a partial demolition of interior walls or floors.

    Or the owner may decide to do nothing. With the rent-stabilized tenant evicted, the unit may be put back into circulation, only this time at market value, which in Manhattan may be four times the previous rent.

    The assemblymember said the only way to tighten this loophole is to clean up the agency and introduce legislation that ensures that demolition means exactly that.

    “Demolition should be down to the ground, not a partial renovation just to take the apartment out of rent control,” she said.

    With Councilmember Rosie Mendez, Glick is spearheading a drive to end the issuing of permits for “phony demolitions,” and is very critical of the way the governor has handled the agency.

    “Frankly, under Governor Pataki, D.H.C.R. has been overtly hostile to tenants’ interests,” she said.

    “This phony demolition is a serious threat to rent-regulated tenants, and people should be concerned not just about the next few months while there is still a Pataki-appointed head of D.H.C.R., but also should be concerned enough to ask questions of gubernatorial candidates after he leaves office,” Glick added.

    Bob Liff, a spokesman for Extell, denied rumors that the company had any intentions of using the provision to evict tenants in the East Village properties.

    “My understanding is that they are going to improve and manage the properties they purchased,” he said.

    Lone said that since 1997, over 100,000 units in the city have been taken out of the rent-regulation program.

    “Right now, all over the city we have heard of 50 cases where it’s being used,” he said of “phony demolitions.”

    In addition to investments in New York City real estate, Extell has also been busy making significant contributions to political representatives at the city and state level.

    State Attorney General Eliot Spitzer; Melinda Katz, chairperson of the City Council’s Land Use Committee; and Council Speaker Christine Quinn have all received generous donations from Extell or its employees, according to Liam Arbetman, a researcher for Common Cause, a nonpartisan watchdog that monitors financial contributions in city, state and federal politics.

    He said that since 2004, Spitzer has received over $100,000, Katz, $14,500 and Quinn, $7,500 from Extell.

    Despite Liff’s denials, tenant anxieties have been aggravated, Lone said, by an ongoing bid by Extell to evict the several occupants from a seven-story loft building on E. 17th St., which it purchased from Ovid Real Estate last year.

    One of the tenants, Peter Persoff, who has lived there for over 28 years with his wife, said that having failed by other means to evict him, his wife and a female tenant above them, Extell is now resorting to demolition and has notified him of a recent application filed with the D.H.C.R.

    Persoff said that problems with Extell began not long after the building was transferred over.

    “Almost immediately, several phone calls from them came, each time saying we would like to buy your lease out,” he said. “The first time they apologized and said they won’t call again. Then they sent a letter offering $75,000 and then they called again. They were persistent.”

    A twist in developments occurred on May 30 of this year when he received an envelope with two letters in the mail.

    Dated May 26, the first letter informed him that Extell Development Corporation would not be renewing his lease; the second one informed him why: Extell had applied for a demolition permit with D.H.C.R.

    At 65 years old, the New York native said that the struggle, which comes on the heels of similar problems with the previous owner, has made life for him and his wife very difficult.

    “It’s very stressful, as you can imagine,” he said. “Over the years, this was a crummy loft when we got it and I have made improvements and have put down a hardwood floor which came from my wife’s dance rehearsal studio.

    “Imagine if you have done a Sisyphus, imagine, to fix up this place, and now you are being told you are evicted,” he added.

    Having lost several commercial properties to developers in their lifetime, Persoff and his wife insist that this fight will be different.

    “Wherever we are, they are getting us,” he said. “I lost my studio to real estate developers and my wife did, as well…. And now our home is being threatened by these people in their attempts to maximize their profits. This is our last stand.”

    © 2006 Community Media, LLC

  4. #64

  5. #65

    Default

    Here's an interesting never-built project that perhaps the city should re-examine. It seems like with the exception of Battery Park City these landfill proposals never get off the ground, think Safdie's Habitat, Gehry's Guggenheim, and Manhattan Plaza which was supposed to be the World Trade Center for the East Side.

    East Cove Development Plan, 1980. Rafael Vinoly.

    Mixed-Use, Residential, Sports and Recreation.

    The first project undertaken by Viñoly’s nascent New York practice was a master plan for a residential development on Manhattan’s Lower East Side. The plan called for four high-rise towers sited on 30 acres of landfill along the East River. The towers, to house middle-income and luxury apartments, would have been surrounded by a landscaped park including a recreational marina.


  6. #66

    Default

    Is Waterside Plaza on landfill? I suppose this development would be Waterside writ large.

  7. #67
    Disgruntled Optimist lofter1's Avatar
    Join Date
    Jun 2005
    Location
    NYC - Downtown
    Posts
    32,654

    Default

    WP is built on pilings.

  8. #68

  9. #69
    NYC Aficionado from Oz Merry's Avatar
    Join Date
    Oct 2002
    Location
    Australia
    Posts
    7,468

    Default

    Stalled projects come back from dead

    Some construction sites see building again, but with downsized plans or deep discounts

    By Sarah Ryley


    From left: 360 Smith Street, 73 Pineapple Street, 303 East 51st Street, Beekman Tower and 189 Schermerhorn Street

    Hundreds of dormant construction sites still dot the city, but a handful of these beleaguered projects are finally seeing new life -- even if it's not what was once dreamed of for the location. Those that have seen some type of resolution were able to do so by selling off their debt at steep discounts, slimming their construction costs or setting their sights way lower.

    This month, The Real Deal tracked down 20 stalled projects that have seen some type of resolution within the past several months (see chart below or click here).

    Eight of those boarded-up sites are in the process of becoming parking lots, city schools or low-slung retail -- so-called "taxpayers" because the monthly rent they are getting is merely intended to cover carrying costs while the owner awaits a better market.

    Nine projects were either snapped up by new, bargain-hunting owners, or saved by well-capitalized equity partners who bought the debt at a discount while retaining partnership with the existing developer.

    And the last three projects were jump-started thanks to an agreement finalized in March between labor unions, contractors and developers that shaved up to 20 percent off the cost of building.

    This labor pact has been helping developers retain profitability in the face of a declining real estate market. But it has done little to resurrect the roughly 530 projects that the city Department of Buildings lists as stalled.

    As a result, the construction industry is strongly considering further lowering their rates when the agreement comes up for renewal in March, said Lou Coletti, president of the Building Trades Employers' Association of New York.

    "If we don't extend this agreement or come up with a new one, the unionized construction industry in New York City will be significantly diminished," he said, adding that its roughly 30 percent unemployment rate could grow to 50 percent by the end of this year (see "Construction firms get modest").

    Below is an account of how some developers at once-stuck projects managed to figure out either long-term solutions or Band-Aids until the market turns.

    Narrowing the divide

    By and large, industry experts say that stalled development is tough to revive right now because construction financing is scarce. In addition, the parties involved want more money than new investors -- and the market as a whole -- indicate the project is worth.

    But that gap appears to be slowly narrowing, according to some investors seeking stalled projects, with the going rate around half off peak prices.

    Robert Knakal, chairman of investment brokerage Massey Knakal, sold a long-stalled four-unit project in Chelsea for $3.4 million in June -- 57.5 percent less than the $8 million debt the lender foreclosed on. Construction on the four-unit condo resumed in August.

    Also in Chelsea, Chicago-based Equity Residential paid $11.5 million last month for the ground lease to build the 96-unit High Line project that developer Shaya Boymelgreen was planning. Construction hasn't resumed yet, but the purchase price was 51 percent less than what Boymelgreen paid for the ground lease in 2005.

    "We are seeing with projects that are underwater [mortgaged for more than they are worth], banks are not disclosing prices, but they are listening to any kinds of offers that we have," said Andres Hogg, head of U.S. operations for Espais. Hogg said Espais, the developer behind the nearly sold-out Twenty9th Park Madison, is looking to invest around $50 million in stalled projects.

    "Six months ago, [lenders] were barely trying to discuss it, because they were trying to find a solution with the existing developer," said Hogg, who noted that the existing developer is oftentimes angling to buy out the debt with new equity partners. "Depending on how advanced the project is, [the banks] are less interested in talking to us."

    Based on admittedly limited information -- only 300 distressed assets nationwide -- banks have had the second-highest rate of recovery when liquidating distressed assets in the New York metropolitan area, 70 percent, compared to a 59 percent national average, according to Real Capital Analytics. Los Angeles was No. 1 at 73 percent.

    "Investors do recognize the long-term value of New York City property, and are willing to move up the risk spectrum a little bit more to get their hands on these assets," said Dan Fasulo, managing director at Real Capital Analytics. "A distressed project in New York has less risk than a similar project in Detroit."

    However, the Real Capital Analytics report notes that as banks tackle increasingly troubled properties, their recovery rate, or the percent of money they lent that they are getting back, is dropping. Fasulo said the ones being resolved the quickest these days "are the ones where, if the lender takes over the project, something needs to be done to recover the value."

    The site of the infamous 2008 crane collapse, 303 East 51st Street, is one such project. Stalled for 22 months and in foreclosure, The Real Deal reported in November that Israeli-based HFZ Capital agreed to acquire the note from Arbor Realty Trust for $40 million -- 43 percent less than the amount in overdue loans. HFZ officials declined to comment.

    Hogg, along with another developer who looked at the site, which has been stuck at 19 stories since the collapse, said only a steep discount -- "30 cents on the dollar" -- would sufficiently cushion the project from financial failure given its level of deterioration and legal and zoning issues that need to be worked out.

    For these reasons, vacant lots and foundations can be simpler transactions.

    "We are looking at purchasing some vacant lots, and the value of that lot is 50 percent off what it was valued at the peak, and I think that is the maximum that we would be willing to pay," said Hogg.

    The New York City School Construction Authority is also in the market for vacant lots, and has snapped up several within the past year where construction never got off the ground. They include $33.4 million for a half-acre of developer Sheldon Solow's troubled 9.2-acre East River project, and $5.2 million for land in Borough Park where condos had been planned.

    David Junik, a partner at Greiner-Maltz Real Estate who has sold several distressed sites within the past year, including the one in Borough Park, said he has two privately listed, stalled warehouse conversions in Williamsburg where the bank shaved 36 percent and 67.5 percent off what it was asking a year and a half ago.

    "Banks are beginning to realize that they don't want to sit with dead money for too long," said Junik. "And now we are beginning to see that apartments are beginning to sell at huge discounts, but they are selling," which has finally provided some barometer for how much a property should be discounted.

    Setting the barometer


    Warehouse 11

    One project setting the barometer is Warehouse 11 in Williamsburg, which stalled last summer at around 98 percent complete while lender Capital One attempted to foreclose on the property and the owners filed for bankruptcy protection.

    Now priced at 21 percent less than the original $709-per-square-foot asking price (or less than $600 per square foot), apartments are selling briskly. The scene at the 120-unit condo's relaunch party last month was like a sample sale for interior designer Andres Escobar.

    Dozens waited in the frigid weather for the doors to open, then crowded the moodily lit office to fill out mortgage applications, waving around checkbooks while house music bumped in the background.

    David Maundrell, president of the brokerage aptsandlofts.com, said the sales team had more than 350 appointments to view apartments that night, and they accepted 34 offers, contingent on financing.

    Months earlier, developers Yitzchok Schwartz and Isack Rosenberg of McCaren Park Mews LLC were fighting Capital One in court for the right of first refusal to purchase the project's $45.6 million note, which the bank was marketing through Massey Knakal for around $34 million, according to court documents.

    But Capital One had attempted to prevent the developers from even entering the property, accusing the duo of stealing appliances and letting a leakage problem fester in order to devalue the property. Attorneys and developers involved in the case would not comment on the exact nature of the resolution. But a source told The Real Deal that the developers are trying to raise enough cash through sales to buy the discounted note themselves before a lender-imposed deadline of March 31.

    Maundrell said the building is basically finished, and received its certificate of occupancy in November.

    Similarly, construction at be@schermerhorn in Downtown Brooklyn also stalled and then resumed when it was more than 90 percent complete.

    Michael Phillips, marketing director for Jamestown Properties, the equity partner on the project, said the building is expected to be marketed at "the mid-$600s" per square foot, 26 percent less than when it first came to market in September 2008, the same week Lehman Brothers collapsed.

    Phillips said the project, developed by SDS Procida, stalled at 92 percent complete last June as the lender attempted to pull out, citing 5 percent cost overruns. Jamestown, already an equity investor in the project, was well-capitalized enough to purchase the $100 million mortgage from Wachovia Bank at an undisclosed discount, and construction restarted in November.

    He said they are in the process of installing the last fixtures, and will relaunch sales once an amendment to the offering plan is approved.

    Prime parking

    While some developers sitting on vacant lots may have had grand visions of erecting sleek condos with fancy amenities before the downturn, those dreams have been downsized.

    If an owner can afford to keep a property rather than selling it for a loss, sometimes the best option is to convert it into a parking lot, or a one-story "taxpayer" building with room for a retail tenant who will provide enough rental income to cover the carrying costs.

    The Wings Group, a partner in the Brompton on the Upper East Side, originally planned to erect a 14-story sliver tower with apartments and retail at 304 Fifth Avenue, but couldn't get construction financing once the real estate market tanked. So, project manager Ariel Levy said the firm is now constructing a one-story retail building with a basement -- 4,000 square feet in total that will cost less than $300,000 to build -- with the hopes of earning around $400,000 annually in rent until the economy turns.

    "We're not looking to put up what is going to be your state-of-the-art building here," said Levy, adding that potential tenants include nail salons, small grocers or souvenir shops, given the location's proximity to the Empire State Building and Koreatown.

    "We don't want to sell the property at a loss when we know that in three to five years it's going to be a different game," he said.

    In 2007, the firm paid $7.5 million for the property, which was then occupied by a four-story building.

    Parking can also bring in a decent chunk of change -- monthly rates run around $250 for a regular-size car in the areas where The Real Deal found stalled-sites-turned-parking lots, estimated Brian Ezratty, vice chairman of investment brokerage Eastern Consolidated.

    At Canal and Eldridge streets, landlord and developer Baruch Singer tore down a tattered five-story building in the hopes of replacing it with a 16-story, 79,000-square-foot mixed-use tower. He lost financing "in the final hour," and in November, filed plans for a 100-space parking lot.

    "The parking is only a stopgap measure until you can get construction financing and the market comes back," said Singer.

    In Williamsburg -- the neighborhood with the highest concentration of stalled projects -- there are at least three such parking lots within two blocks of each other. One, at 510 Driggs Avenue, was supposed to be a 50-unit rental building.

    The other two, at 261 and 237 North 9th Street, where 240 apartments were planned in two buildings, do not have permits from the city.

    "The city gives us a lot of headache because they are not looking to give you a permit," said the operator of those parking lots, who would not give his name. He said he runs "tons" of parking lots on stalled sites in Brooklyn and is looking at opening more. "Flatbush Avenue, all of Clinton Hill and Park Slope" are ripe for the picking.

    "I know of a couple of sites that were parking lots, deals fell through, and now continue to be parking lots," said Ezratty. "But it's very hard to get a Certificate of Occupancy to park cars when you haven't had one previously," he said, explaining that the city is not eager to park cars where towers were supposed to rise.

    Labor savings


    Tower 111

    Several stalled projects that already had significant financial backing were able to resume construction with the help of the much-ballyhooed labor-savings agreement that is up for renewal next month.

    That agreement, which saved developers between 10 and 20 percent on building costs, has already been implemented at 36 projects citywide totaling $6 billion worth of construction contracts as of press time. In addition, seven new contracts were pending, said Coletti of the Building Trades Employers' Association.

    Only three of the projects where the agreement is in effect -- Tower 111, Beekman Tower and Related Companies' 42nd Street tower -- appeared to have actually been stalled for an extended period of time. And the latter two projects already had a combined $1.38 billion in government financing.

    But Coletti said many more of the projects on the list were on the verge of being stalled. "Clearly the cost of construction is going to have to continue to go down if we're going to give a developer any opportunity to move forward on a [stalled] project," he said.

    In addition to much stricter financing requirements, rents and residential sale prices have dropped by around a quarter since most of the stalled projects were conceived.

    Forest City Ratner Companies, for example, originally expected to get $80 per square foot for its 903-unit Beekman Tower rentals, according to the New York Times. Today, the listings aggregator StreetEasy pegs the average asking rent in the Financial District at $50 per square foot (although none of those buildings have a wavy façade designed by Frank Gehry).

    The 76-story tower had stalled at 37 floors in March while Ratner sought ways to trim costs. It was among the first projects to take advantage of the labor-savings agreement.

    "We've received fewer and fewer [new contracts] as we've moved forward, and that was a clear indication to us this [agreement] was nothing more than a Band-Aid," said Coletti. "It had helped us avert an immediate unemployment crisis, but in the longer term it pushed that crisis back to 2010 and longer."

    Click charts below to view larger versions




    http://therealdeal.com/newyork/artic...back-from-dead

  10. #70

    Default

    For a look at some of the AEC software that is used in the 'VISIONS' stage of Architecture, Engineering & Construction - take a look at this webpage. Enjoy!


    http://www.aec-apps.com/

  11. #71

    Default

    Some tower that now appears on Helpern's website. Looks like it's around 29th Street between Bway and 5th.




    More here:
    http://www.helpern.com/portfolio/midtown-tower/

  12. #72
    Forum Veteran
    Join Date
    Jan 2002
    Location
    West Harlem
    Posts
    2,805

    Default

    Just something I noticed: Calatrava is hiring architects to join his firm for work on residential projects in the city. Not sure what those projects are.

  13. #73

    Default

    Looks like this block front of Fifth Ave between 46th and 47th will be redeveloped. Joe Sitt will redevelop the two southern buildings into a retail store and Extell will build a tower to the north of it.

  14. #74
    Build the Tower Verre antinimby's Avatar
    Join Date
    Sep 2004
    Location
    in Limbo
    Posts
    8,976

    Default

    They can't be serious. There are some very nice buildings there.

  15. #75

    Default

    Quote Originally Posted by Derek2k3 View Post
    Looks like this block front of Fifth Ave between 46th and 47th will be redeveloped. Joe Sitt will redevelop the two southern buildings into a retail store and Extell will build a tower to the north of it.
    That's quite sad as the buildings on the north end are nice. Hopefully, Extell won't build its usual, cheap glass box. There is an opportunity to set the bar high for this dreary stretch of 5th.

    I was sad to see Silverstein sign a lease for his crappy, 70s box across the street.
    Last edited by londonlawyer; December 24th, 2013 at 08:26 AM.

Page 5 of 6 FirstFirst 123456 LastLast

Similar Threads

  1. 30 Rockefeller Center - GE Building / former RCA Building - by Raymond Hood
    By ddny in forum New York Skyscrapers and Architecture
    Replies: 71
    Last Post: July 23rd, 2015, 11:04 PM
  2. Roll Back MTA Fare to $1.50, says Judge
    By Agglomeration in forum New York City Guide For New Yorkers
    Replies: 20
    Last Post: October 29th, 2004, 07:54 AM
  3. Manhattan Strikes Back at Suburbs
    By Kris in forum New York Real Estate
    Replies: 1
    Last Post: July 16th, 2003, 11:06 AM
  4. Libeskind Backers Fight Back
    By ZippyTheChimp in forum New York Skyscrapers and Architecture
    Replies: 11
    Last Post: February 16th, 2003, 06:02 AM
  5. Seven Achitects Offer their Visions for Ground Zero
    By Edward in forum New York Skyscrapers and Architecture
    Replies: 0
    Last Post: October 13th, 2002, 08:20 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


Google+ - Facebook - Twitter - Meetup

Edward's photos on Flickr - Wired New York on Flickr - In Queens - In Red Hook - Bryant Park - SQL Backup Software