Thread: 175 Greenwich Street - Proposed WTC Tower # 3 - by Richard Rogers

  1. #211

    Default

    Fascinating how fast the Deutsche Bank building has come down once the legal quagmire around its disassembly was settled.

  2. #212
    Disgruntled Optimist lofter1's Avatar
    Join Date
    Jun 2005
    Location
    NYC - Downtown
    Posts
    31,513

    Default

    Another post ^ in need of a "sarcasm" [ ] smilie

    ... Decontamintation work will resume likely by late 2007, once a subcontractor for the work has been secured.

  3. #213
    Forum Veteran TREPYE's Avatar
    Join Date
    Apr 2006
    Location
    Brooklyn, NY
    Posts
    1,821

    Default Saw this one coming...

    Heads up by NYguy in SSP.com...

    Port Authority Could Owe Larry Silverstein $12 M.-Plus for Delays


    by Eliot Brown | December 31, 2007
    Getty Images.
    Larry Silverstein.


    The Port Authority acknowledged today that it will miss its deadline of Jan. 1, 2008 to finish up excavations on the bathtub for World Trade Center Towers 3 and 4, thereby owing developer Larry Silverstein more than $12 million in delay penalties given the agency’s current timeline.
    The Port Authority will owe Silverstein Properties $300,000 for every day until the excavations are done, and in a statement, the agency said that the bathtub would be ready for complete handover to Mr. Silverstein in about two to four weeks after mid-January (when they expect to finish excavations for Tower 4).
    The Port Authority, which owns the World Trade Center site and is leasing the land for Towers 2, 3, and 4 to Silverstein, said in the statement that the hit from the penalties will in part be passed along to its contractors.
    Silverstein, in a statement, said it will begin “pre-construction activities” as the firm waits on the Port.
    Release below:

    Statement by Port Authority Regarding Preparation of Towers 3 and 4 Bathtub
    At WTC Site to Allow Silverstein Properties to Begin Construction in January

    The Port Authority announced today that it has substantially completed the excavation of the basement area for Towers 3 and 4 at the World Trade Center site, and that it would complete the entirety of the excavation of Tower 4 by mid-January, and Tower 3 two to four weeks later. In keeping with this timetable, Silverstein Properties will advance procurement and other preconstruction activities in preparation for full-scale construction.
    The construction of the Towers, including below- and above-grade retail and subterranean transit concourses, is expected to be completed by Silverstein Properties in 2011.
    The unprecedented 12-month excavation and construction project - which involved the removal of nearly 300,000 tons, or enough concrete, soil and rock to fill Giants Stadium - will be completed within weeks of its original schedule established in an agreement with Silverstein Properties in mid-2006. Fifty miles of trucks was required to remove the material from the “bathtub” in recent months. In addition to clearing the site, the work involved the intricate installation of approximately 400 tiebacks, which if placed end-to-end would stretch down Interstate 95 from Manhattan to Philadelphia, and the pouring of enough concrete to pave a sidewalk from Wall Street to Rockland County, N.Y.
    As a whole, the project is more than 90 percent complete. The excavation for the bathtub for Towers 3 and 4 must be dug to elevation 240. To date, 80 percent of the site for Tower 4 has reached elevation 240, and the remaining portion ranges from between elevations 241 and 248. The site for Tower 3 has been excavated to as low as elevation 264.
    Under a master redevelopment agreement approved by the Port Authority Board of Commissioners in September 2006, the bistate agency agreed to take over development of 1 World Trade Center, the Freedom Tower and the Tower 5 site. Silverstein Properties is responsible for construction of Towers 2, 3 and 4.
    The Port Authority’s agreement with Silverstein Properties calls for it to make payments of approximately $300,000 per day if any section of the excavation is not completed by January 1.
    The Port Authority expects these costs will be largely offset by reduced payments to its contractors, and Silverstein Properties will reinvest these payments in the ongoing $16 billion of construction throughout the site.
    The Port Authority is on schedule to complete the below-ground excavation for the Tower 2 site by the end of June 2008. Currently, nearly every section of the 16-acre World Trade Center site is under construction. There are currently more than 700 construction workers and 100 pieces of heavy equipment on the site.
    Major construction on 1 World Trade Center, the Freedom Tower began in mid-2006. The tower’s footings and foundations are nearly complete, and steel will begin to rise above street level during the first part of 2008.
    Construction of the foundations for the World Trade Center Transportation Hub and Memorial also are under way. Major steel beams for both projects are scheduled to be erected during the upcoming year.

    http://www.observer.com/2007/port-au...2m-plus-delays

  4. #214
    Moderator NYatKNIGHT's Avatar
    Join Date
    Oct 2002
    Location
    Manhattan - South Village
    Posts
    4,240

    Default

    Silverstein made some changes. Think "trading floors".

  5. #215
    Kings County Loyal BrooklynLove's Avatar
    Join Date
    Aug 2007
    Location
    Brooklyn, planet Earth
    Posts
    2,750

    Default

    Quote Originally Posted by NYatKNIGHT View Post
    Silverstein made some changes. Think "trading floors".
    ???

  6. #216
    Moderator NYatKNIGHT's Avatar
    Join Date
    Oct 2002
    Location
    Manhattan - South Village
    Posts
    4,240

    Default

    New renderings that I can't share yet will explain what I'm talking about. But remember what trading floors did to the Tower 5 design?

  7. #217

    Default

    Is the tower stumpier now?

  8. #218
    Moderator NYatKNIGHT's Avatar
    Join Date
    Oct 2002
    Location
    Manhattan - South Village
    Posts
    4,240

    Default

    Same height but pregnant belly that cantilevers out in the manner of that Morgan-Chase rendering, though more refined. So the profile is different.
    Last edited by NYatKNIGHT; April 25th, 2008 at 10:43 AM.

  9. #219

    Default



    Couldn't a pregnant belly go farther in jazzing up Tower 4?

  10. #220

    Default

    What!!

  11. #221

    Default

    If true this would be no less than a disaster.

  12. #222

    Default

    Are they ruining the most graceful (and probably the best) WTC tower?

    Following NYC news lately has just been a delight.

  13. #223
    Forum Veteran
    Join Date
    Aug 2003
    Location
    Manhattan
    Posts
    2,636

    Default

    Quote Originally Posted by lammius View Post


    Couldn't a pregnant belly go farther in jazzing up Tower 4?
    Tower 4 is completly leased already so no need to change design, that build will be completed on time without a doubt

  14. #224
    Random Personality
    Join Date
    Aug 2005
    Location
    Woodside, Queens
    Posts
    916

    Thumbs down

    Such depressing news indeed.

  15. #225
    Senior Member
    Join Date
    Feb 2004
    Location
    Far West Village, NYC
    Posts
    924

    Default

    Doesn't this tower already has 6-7 trading floor-sized plates in its base. If more are needed why build a cantilever, why not just make the pedestal taller. I suppose that if the cantilever is a similar sized and shape as the base (from which the tower is set back) and it is kept low (say it begins a few floors above the base) than it might not be that bad. If they build a cantilever 25 stories up, it would be awkward. Sounds like the skyline impact of WTC3 will not be affected.

Similar Threads

  1. Greenwich Village Preservation Watch - Be on the alert!
    By OKoranjes in forum New York Real Estate
    Replies: 5
    Last Post: August 4th, 2012, 01:25 AM
  2. Greenwich Street 'Restoration'
    By Kris in forum New York City Guide For New Yorkers
    Replies: 41
    Last Post: July 19th, 2012, 06:11 PM
  3. 165 Charles Street @ West Street - by Richard Meier
    By ASchwarz in forum New York Skyscrapers and Architecture
    Replies: 104
    Last Post: June 8th, 2010, 05:36 PM
  4. 497 Greenwich Street - Condo
    By Edward in forum New York Real Estate
    Replies: 27
    Last Post: February 3rd, 2006, 04:44 PM
  5. Director's Guild of America Tower -110 West 57th Street
    By londonlawyer in forum New York Real Estate
    Replies: 4
    Last Post: July 18th, 2003, 11:37 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


Wired New York on Google+ - Facebook - Twitter - Meetup -

Edward's photos on Flickr - Wired New York on Flickr - In Queens - In Red Hook - Bryant Park - SQL Backup Software